Cell Power Down

Cell Power Down Notation

The following procedure covers the power down of the 2V11 Bodyside Sub Cell. This procedure assumes that the 2V11 Bodyside Sub Cell is currently cycling in Automatic Mode of operation.

Allow only personnel with appropriate training and experience to operate or service the equipment. The use of untrained or inexperienced personnel to operate or service the equipment can result in injury, including death, to themselves and others, and/or damage to the equipment.

Step 1: Main Operator Panel (MOP)

  • Place the two-position selector switch into the "MAN" position.

Step 2: Main Operator Panel (MOP) - Cycle Stop

  • From the Main Operator Panel (MOP), press the "Menu" button. This will redirect users to the Operating Mode Screen.
  • From the Operating Mode Screen, press the "Cycle Stop" function button. The equipment within the cell will finish its current cycle and all station equipment will return to the Home position.

Step 3: Water System

  • Place the Plant Water In Ball Valve to the "CLOSED" position.
  • Place the To Header Ball Valve to the "CLOSED" position.
  • Place the From Header Ball Valve to the "CLOSED" position.
  • Place the Plant Water Out Ball Valve to the "CLOSED" position.
  • On each ABB Weld Controller, place the To Header and From Header Ball Valves to the "CLOSED" position.

Step 4: Ancillary Air

  • At the Station Level Air Distribution Panels (or Ancillary Air Panels) place the Safety Lockout Valve to the "CLOSED" position.
    • On the pressure regulator or digital pressure switch, verify there is a zero (0) reading.

Step 5: Main Air Distribution Panel

  • At the Main Air Distribution Panel, rotate the safety lockout valve to the "CLOSED" position.
  • On the pressure regulator unit, verify there is a zero (0) reading on the pressure regulator unit.

Step 6: ABB Weld Controller

  • At each ABB Weld Controller, rotate the disconnect switch to the "OFF" position.
Typical ABB Weld Controller

Step 7: IRC5 Robot Controller Single Cabinet

  • At each ABB IRC5 Robot Controller, rotate the Main Power Selector Switch to the "OFF" Position.

Step 8: Weiss Variable Frequency Drive (VFD) Controller

  • At the Weiss Variable Frequency Drive (VFD) Controller, rotate the disconnect switch to the "OFF" position.

Step 9: Power Distribution Panel

  • At the Power Distribution Panel (PDP), place the Main Electrical Disconnect switch to the "OFF" position.

Step 10: Power Distribution Panel (PDP) Uninterrupted Circuits

  • If control power had been shut off, open the Power Distribution Panel (PDP) and rotate the uninterrupted power rotary switch to the "OFF" position.
  • Close and latch the PDP door.

Step 11: Brauer Systemtechnik Cap Changers

  • At each Brauer Systemtechnik Cap Changer, rotate the disconnect switch to the "OFF" position.

Step 12: ABB Tip Dresser

  • At each ABB Tip Dresser, place the rotary disconnect to the "OFF" position.