1 |
Operators 1 and 2 load the Firewall Outer Shelf and Firewall Outer parts onto the Geo
Fixture (2V05-V01GL1UQ51) at Station 010. |
2 |
Conveyor (2V05-V01GL1) transfers the Station 010 Geo Fixture (2V05-V01GL1UQ51) to the Station 010
Robots. |
3 |
Operators 1 and 2 load Firewall Inner parts onto the Geo Fixture (2V05-V01GL1) at Station 020. |
4 |
Conveyor (2V05-V01GL2) transfers the Station 020 Geo Fixture (2V05-V01GL1) to the Station 020 Robots. |
5 |
Robots (2V05-V01AR21, 2V05-V01AR22, and 2V05-V01AR23) make multiple spot welds to the part on
Geo Fixture 2V05-V01GL1UQ51. |
6 |
Robots (2V05-V01AR24 and 2V05-V01AR25) make multiple spot welds to the part
on Geo (2V05-V01GL2). |
7 |
Robot (2V05-V01AR41) picks up the part from Geo Fixture 2V05-V01GL1UQ51. |
8 |
Robot (2V05-V01AR42) picks up the part from the Geo Fixture (2V05-V01GL2). |
9 |
Robot (2V05-V01AR41) moves the part to Pedestal Welder (2V05-V01AR41XQ11)
which does multiple spot welds. |
10 |
Robot (2V05-V01AR42) moves the part to Pedestal Welder (2V05-V01AR42XQ11)
which does multiple spot welds. |
11 |
Robot (2V05-V01AR41) places the part into the Respot Fixture (2V05-V01UQ51) and moves to clears. |
12 |
Robot (2V05-V01AR26) spot welds the part in the Respot Fixture (2V05-V01UQ51). |
13 |
Robot (2V05-V01AR42) places the part into the Geo Fixture (2V05-V01UQ52) and moves to clear. |
14 |
Robots (2V05-V01AR29, 2V05-V01AR28, and 2V05-V01AR27) make multiple spots welds to the part
at the Geo Fixture (2V05-V01UQ52). |
16 |
Robot (2V05-V01AR11) picks up the part from the Respot Fixture (2V05-V01UQ51) and places it into
the Draw Arc Fixture (2V05-V01UQ54) and moves to clear. |
17 |
Robot (2V05-V01AR12) picks up the part from the Geo Fixture (2V05-V01UQ52) and places it
into the Respot Fixture (2V05-V01UQ53) and moves to clear. |
18 |
Robot (2V05-V01AR51) makes multiple stud welds to the part at the Draw Arc Fixture (2V05-V01UQ54). |
19 |
Robots (2V05-V01AR213, 2V05-V01AR211, and 2V05-V01AR212) make multiple welds to the part on the Respot
Fixture (2V05-V01UQ53). |
20 |
Robot (2V05-V01AR14) picks up the part at the Draw Arc Fixture (2V05-V01UQ54) and places
the part onto the Vision Check Fixture (2V05-V01UQ55). |
21 |
Robot (2V05-V01AR13) picks up the part at the Respot Fixture (2V05-V01UQ53)
and places the part onto the Vision Check Fixture (2V05-V01UQ55). |
22 |
Robot (2V05-V01AR191) moves to to the Vision Check Fixture (2V05-V01UQ55) and performs Vision Checks and
then moves to clear. |
23 |
Robot (2V05-V01AR14) picks up part at the Vision Check Fixture (2V05-V01UQ55). |
24 |
If part failed at the Vision Check Fixture (2V05-V01UQ55), tne part is placed in the
Pullout Cart (2V05-V01UN1). |
25 |
If part passed at the Vision Check Fixture (2V05-V01UQ55), the part is Date Stamped at (2V05-V01PF1). |
26 |
Robot (2V05-V01AR14) places finished parts on the overhead conveyor (2V05-V01GL11). |