The following parts are assembled on the 2V13 Sub Floor Cross Member Cell to create the Sub Floor Cross Member:
Cab Back Front Suspension Assembly
Member Front Long RH Assembly
Member Front Long LH Assembly
After all parts are assembled, parts are moved from the bins at Station 030 to 2V02 Underbody Structure by
forklift.
Use the searchable fields in the table below to view, select, and download the desired documentation.
The documentation that can be found in the table below includes VMMS Sheets, Lubrication Maps, and
Standard Maintenance Procedure (SMPs).
Brauer Cap Changers - 2V13-V01AR21VUT1, V01AR22UT1
Standard Maintenance Procedure
Excel
ABB Material Handling Robots - 2V13-V01AR21UQ41, 2V13-V01AR42UQ42
Standard Maintenance Procedure
Excel
Mig Weld End of Arm Tooling - 2V13-V01AR61XQ21 / 2V13-V01AR61XQ21
Standard Maintenance Procedure
Excel
Torch Cleaning Station 2V13-V01AR61XQ22 / 2V13-V01AR61XQ22
Standard Maintenance Procedure
Excel
2V13 Sub Floor Cross Member
VMMS Sheet
Excel
Roll over to view components2V13 Sub Floor Cross Member Equipment Layout
Process
The following is a abridged version of the sequence of operation for the 2V13 Sub Floor Cross Member Cell.
Select the Download button for the full sequence of operation.